Permit filing
Build-out permits go to the City of New Orleans Department of Safety and Permits or the relevant parish authority, and we track approval.
At TurnKey Renovators, we build out shell spaces, second-generation sites and newly leased properties across Greater New Orleans, turning raw square footage into a finished, code-compliant space for an office, a store, a restaurant or a medical suite. Request your free build-out estimate and we will review the lease space and your plans with you.
Missed scope items are one of the most common reasons build-outs run over budget and schedule, so you see the full scope before we start. Pick a trade to see what it covers.
Steel or wood studs define offices, conference rooms, restrooms and break rooms, then drywall and sound insulation close them in.
Scope My Space
Suspended drop-tile ceilings are standard because they keep above-ceiling systems reachable. Open ceilings are an option for a different look.

Flooring is chosen by traffic level and business type, and walls get Benjamin Moore commercial-grade paint in your brand colors.
We coordinate the MEP subcontractors so every system is ready to pass city inspections.
Scope My Space
Reception counters, built-in shelving and storage cabinets are sourced or fabricated to fit your layout and how you work.
ADA-compliant restrooms go in from framing to fixtures, and commercial doors get hardware that fits the room and meets ADA rules.
Scope My SpaceNot every space needs a ground-up build-out. Knowing which one you have saves time and budget before you sign the lease.
| Factor | Full shell build-out | Second-generation modification |
|---|---|---|
| Starting point | No finished walls, partitions or ceiling grid | A usable layout left by a prior tenant |
| Utilities | Only stub-outs at the perimeter or core | Working MEP systems already in place |
| Typical work | Everything from studs: framing, insulation, drywall, ceilings, floors, paint, lighting, restrooms | Selective demolition, room reconfiguration, new finishes, adapted plumbing and electrical |
| Common with | New construction and first-generation leases | Spaces changing tenants |
| Existing layout | None to work around | Must fit your restroom headcount ratios, HVAC, electrical loads and operational flow |
A skipped permit or a missed inspection pushes back opening day. We manage every one from application to certificate of occupancy.
Build-out permits go to the City of New Orleans Department of Safety and Permits or the relevant parish authority, and we track approval.
Most build-outs need building, mechanical, electrical and plumbing permits.
They must pass before drywall goes up. Late scheduling here is a common source of delays.
You cannot open without one. We schedule final inspections and handle any corrections.
Most commercial build-outs in New Orleans need permitted drawings prepared or reviewed by an architect. We work with yours, or refer you to professionals we have worked with.
Timelines and fees vary with project scope and the current permit backlog.
Build-outs stack overlapping trades. The order below keeps them from stepping on each other.
We review the lease space, your intended use and any landlord work letter obligations before scoping.
We turn your architect's or space planner's drawings into a construction scope, or offer basic space planning on simpler jobs.
We file the permit application and track its approval status.
Framing goes up first, then electrical, plumbing and HVAC rough-in before walls close.
Rough-in inspections are scheduled on time so drywall is not held up.
Drywall, ceilings, flooring, paint, doors, hardware, millwork and final fixtures after inspections pass.
We schedule finals and coordinate any corrections needed for your certificate of occupancy.
A firm estimate needs the space and your plans. These six factors interact to set the number.
A cold dark shell takes more work than a second-generation space with systems in place.
Total area drives materials and labor across every trade.
Special HVAC, high restroom fixture counts or heavy equipment loads cost more than an open-plan office.
Standard commercial finishes cost less than high-end tile, custom millwork or specialty lighting.
Orleans Parish projects go through Safety and Permits, and fees and timing depend on scope and backlog.
How your TI allowance applies to the scope shapes your out-of-pocket cost.
We deliver a detailed scope of work before breaking ground, so you know exactly what is covered.
Lease commencement and opening dates drive the schedule, and we flag early if anything shifts it.
Offices, retail, restaurants and medical suites, with needs like grease traps or ADA restroom ratios built into scope.
We work directly with the landlord's construction manager on plan approvals, inspections and disbursements.
From permit submission to final inspection, you always know where the build-out stands.
We serve commercial tenants in New Orleans, Metairie, Kenner, Harahan, Gretna, Slidell, Mandeville, Covington and Baton Rouge.
Timelines, permits, leases and shells, answered by topic.
It depends on size and scope. A straightforward office build-out in an existing shell might take 8 to 12 weeks from permit approval to final inspection, and larger jobs or specialized MEP systems typically run longer.
Most commercial build-outs in New Orleans need permitted drawings prepared or reviewed by an architect. We coordinate with yours, or refer you to professionals we have worked with on similar projects.
It is money the landlord agrees to put toward build-out costs as a lease incentive, usually stated per square foot. TI funds are typically paid out after work is completed and invoiced, so the tenant pays first and the landlord reimburses.
Most need building, mechanical, electrical and plumbing permits, depending on scope and jurisdiction. Orleans Parish projects go through the City of New Orleans Department of Safety and Permits.
Yes. Many leases name a landlord's representative who approves plans, inspects work and authorizes disbursements, and we coordinate with them throughout the project.
A cold dark shell has no HVAC, no lighting and only utility stub-outs. A warm shell usually has HVAC to the space, basic lighting and sometimes restrooms, so it takes less work to finish.
Offices, retail stores, restaurants, medical and dental suites and other commercial uses. Industry needs such as restaurant grease traps or medical ADA restroom ratios go into the scope from the start.
Tell us about the project and we will come out, measure and hand you a clear written estimate with no hidden fees.